ITAC Assessment: LM0123
ITAC logo
ITAC Assessment: LM0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product plated metal
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 52,000
ft2
Annual Production 50,000
lb
Production Hrs. Annual 6,720
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $430,111 4,696,669
kWh
Electricity Demand $112,126 9,149
kW-mo/yr
Electricity Fees $22,748 -
Natural Gas $225,567 23,982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,533 $33,000 $9,741
106,416
kWh
$5,670
-
kW-mo/yr
- $122 -
02 2.2514: Cover open tanks $7,790 $1,800 - - $7,790
-
MMBtu
- -
03 2.7232: Replace existing hvac unit with high efficiency model $6,789 $20,000 $6,789
56,036
kWh
- - - -
04 4.431: Train operators for maximum operating efficiency $37,630 $1,000 $2,355
26
kWh
- - - $35,275
TOTAL RECOMMENDED $67,742 $55,800 $18,885
162,478
kWh
$5,670
-
kW-mo/yr
$7,790
-
MMBtu
$122 $35,275
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs