ITAC Assessment: OK0748
ITAC logo
ITAC Assessment: OK0748
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aerospace Metal Processing and Plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range greater than $500
M
# of Employees 140
Plant Area 350,000
ft2
Annual Production 3,650,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,524 3,773,600
kWh
Natural Gas $323,486 28,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,984 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,937

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $8,664 $3,013 - $8,664
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,523 $559 $3,523
73,869
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,835 $6,840 $1,835
30,584
kWh
-
04 2.1212: Operate boilers on high fire setting $22,448 $2,495 - $22,448
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $22,467 $1,029 - $22,467
-
MMBtu
06 2.7261: Install timers and/or thermostats $34,710 $1,002 - $34,710
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $8,337 $8,477 - $8,337
-
MMBtu
TOTAL RECOMMENDED $101,984 $23,415 $5,358
104,453
kWh
$96,626
-
MMBtu
TOTAL IMPLEMENTED $58,937 $13,936 $5,358
104,453
kWh
$53,579
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs