ITAC Assessment: MI0272
ITAC logo
ITAC Assessment: MI0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Clinical Laboratory Products
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 200,000
ft2
Annual Production 60,000,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $564,550 14,099,733
kWh
Electricity Demand $404,083 25,999
kW-mo/yr
Electricity Fees $183,681 -
Natural Gas $6,846 423
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $213,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $108,119 $1,400 - - - $108,119 -
02 2.2628: Utilize a less expensive cooling method $59,120 $60,000 $33,416
835,390
kWh
$17,904
-
kW-mo/yr
- - $7,800
03 2.7425: Clean or color roof to reduce solar load $21,227 $27,707 $10,223
255,583
kWh
$11,004
-
kW-mo/yr
- - -
04 2.7221: Lower temperature during the winter season and vice-versa $12,994 $80 $8,471
211,769
kWh
$4,523
-
kW-mo/yr
- - -
05 2.1332: Convert combustion equipment to burn natural gas $4,265 $11,000 - - - $4,265 -
06 2.7111: Reduce illumination to minimum necessary levels $3,714 $2,680 $2,004
50,097
kWh
$1,710
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $1,059 $373 $546
13,660
kWh
$513
-
kW-mo/yr
- - -
08 2.7134: Use photocell controls $1,053 $360 $338
8,453
kWh
$715
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $811 $3,060 $811
20,276
kWh
- - - -
10 2.7447: Install vinyl strip / high speed / air curtain doors $727 $2,044 $261
6,534
kWh
$466
-
kW-mo/yr
- - -
11 2.2515: Use optimum thickness insulation $88 $360 - - $88
-
MMBtu
- -
TOTAL RECOMMENDED $213,177 $109,064 $56,070
1,401,762
kWh
$36,835
-
kW-mo/yr
$88
-
MMBtu
$112,384 $7,800
TOTAL IMPLEMENTED $22,038 $30,767 $11,034
275,859
kWh
$11,004
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs