ITAC Assessment: ME0299
ITAC logo
ITAC Assessment: ME0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Juice
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 38,000
ft2
Annual Production 3,750
Tgal
Production Hrs. Annual 2,875
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,743 1,421,161
kWh
Electricity Demand $44,976 5,411
kW-mo/yr
Electricity Fees $4,644 -
LPG $58,332 6,064
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.1333: Convert combustion equipment to burn oil $8,563 $9,360 - - - $40,500
-
MMBtu
$(-31,937.0)
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,184 $14,916 $4,838
65,064
kWh
$2,346
-
kW-mo/yr
- - - - - -
03 2.2437: Recover waste heat from equipment $4,620 $13,380 $2,030
18,757
kWh
- - $2,590
-
MMBtu
- - - -
04 2.7492: Use proper thickness of insulation on building envelope $1,337 $2,440 $1,337
50,117
kWh
- - - - - - -
05 2.8112: Combine utility meters $1,333 $3,910 - - $1,333 - - - - -
06 2.2136: Install / repair insulation on steam lines $820 $1,637 - - - $820
-
MMBtu
- - - -
07 2.8123: Pay utility bills on time $484 - - - $484 - - - - -
08 2.2123: Insulate feedwater tank $412 $80 - - - $412
-
MMBtu
- - - -
09 3.7212: Improved material handling (mixing and transfer) $87,478 $8,500 - - - - - - $87,478 -
10 3.4156: Use flow control valves on equipment to optimize water use $197 $240 - - - - - - - $197
-
Tgal
11 4.512: Condense operation into one building $7,500 $6,043 - - - - - $7,500 - -
TOTAL RECOMMENDED $119,928 $60,506 $8,205
133,938
kWh
$2,346
-
kW-mo/yr
$1,817 $44,322
-
MMBtu
$(-31,937.0)
-
MMBtu
$7,500 $87,478 $197
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs