ITAC Assessment: KU0470
ITAC logo
ITAC Assessment: KU0470
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fiberglass Power Boats
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 197,900
ft2
Annual Production 1,600
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,261 3,569,168
kWh
Natural Gas $136,293 27,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $219,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 3.2124: Convert to air assisted / airless paint guns $181,872 $5,120 - - $2,043
-
lb
- $179,829
02 3.8142: Distill contaminated solvents for reuse $32,289 $17,350 $(-1,007.0)
(-15,826)
kWh
$2,550
-
gal
- $(-6,004.0) $36,750
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,532 $252 $2,532
39,859
kWh
- - - -
04 2.7135: Install occupancy sensors $2,397 $2,450 $2,397
37,515
kWh
- - - -
05 2.4133: Use most efficient type of electric motors $715 $1,958 $715
11,137
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $352 $352 $170
3,517
kWh
- - $182 -
TOTAL RECOMMENDED $220,157 $27,482 $4,807
76,202
kWh
$2,550
-
gal
$2,043
-
lb
$(-5,822.0) $216,579
TOTAL IMPLEMENTED $219,805 $27,130 $4,637
72,685
kWh
$2,550
-
gal
$2,043
-
lb
$(-6,004.0) $216,579
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs