Assessment Year | 1996 |
---|---|
Principal Product | Fiberglass Power Boats |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
197,900
ft2
|
Annual Production | 1,600
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,261 | 3,569,168 |
kWh
|
$0.066 |
Natural Gas | $136,293 | 27,218 |
MMBtu
|
$5.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $220,157 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $219,805 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.2124: Convert to air assisted / airless paint guns | $181,872 | $5,120 | - | - |
$2,043
-
lb
|
- | $179,829 | |
02 | 3.8142: Distill contaminated solvents for reuse | $32,289 | $17,350 |
$(-1,007.0)
(-15,826)
kWh
|
$2,550
-
gal
|
- | $(-6,004.0) | $36,750 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,532 | $252 |
$2,532
39,859
kWh
|
- | - | - | - | |
04 | 2.7135: Install occupancy sensors | $2,397 | $2,450 |
$2,397
37,515
kWh
|
- | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $715 | $1,958 |
$715
11,137
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $352 | $352 |
$170
3,517
kWh
|
- | - | $182 | - | |
TOTAL RECOMMENDED | $220,157 | $27,482 |
$4,807
76,202
kWh
|
$2,550
-
gal
|
$2,043
-
lb
|
$(-5,822.0) | $216,579 | ||
TOTAL IMPLEMENTED | $219,805 | $27,130 |
$4,637
72,685
kWh
|
$2,550
-
gal
|
$2,043
-
lb
|
$(-6,004.0) | $216,579 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs