ITAC Assessment: MA0632
ITAC logo
ITAC Assessment: MA0632
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Folding cartons
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 150,000
ft2
Annual Production 600
ton
Production Hrs. Annual 4,160
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,294 1,266,184
kWh
Electricity Demand $63,278 5,941
kW-mo/yr
Electricity Fees $8,883 -
Natural Gas $30,158 1,991
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,703 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,404 $14,500 $11,114
89,485
kWh
$2,290
-
kW-mo/yr
-
02 2.7243: Improve air circulation with destratification fans / other methods $5,185 $17,080 $(-2,437.0)
(-19,622)
kWh
$(-288.0)
-
kW-mo/yr
$7,910
-
MMBtu
03 2.7229: Air condition only space necessary $4,818 $19,300 $633
5,100
kWh
- $4,185
-
MMBtu
04 2.2437: Recover waste heat from equipment $3,265 $4,100 - - $3,265
-
MMBtu
05 2.7314: Reduce ventilation air $2,499 $9,000 $108
866
kWh
- $2,391
-
MMBtu
06 2.5121: Redesign flow to minimize mass transfer length $2,149 $11,000 $2,149
17,300
kWh
- -
07 2.2511: Insulate bare equipment $383 $650 - - $383
-
MMBtu
TOTAL RECOMMENDED $31,703 $75,630 $11,567
93,129
kWh
$2,002
-
kW-mo/yr
$18,134
-
MMBtu
TOTAL IMPLEMENTED $19,551 $28,250 $11,222
90,351
kWh
$2,290
-
kW-mo/yr
$6,039
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs