Assessment Year | 2005 |
---|---|
Principal Product | raisins |
NAICS | 311423: Dried and Dehydrated Food Manufacturing |
SIC | 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes |
Sales Range | $10 M to 50M |
# of Employees | 48 |
Plant Area |
39,000
ft2
|
Annual Production | 20,000
ton
|
Production Hrs. Annual | 3,336
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $157,370 | 1,779,211 |
kWh
|
$0.088 |
Electricity Demand | $60,804 | 5,927 |
kW-mo/yr
|
$10.26 |
Natural Gas | $50,567 | 5,718 |
MMBtu
|
$8.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,632 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,177 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1231: Establish burner maintenance schedule for boilers | $4,353 | - | - | - |
$4,353
-
MMBtu
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $6,788 | - | - | - |
$6,788
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $258 | - |
$258
6,229
kWh
|
- | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $1,926 | $807 | - | - |
$1,926
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,186 | $14,112 |
$7,162
79,995
kWh
|
$3,024
-
kW-mo/yr
|
- | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $20,484 | $30,250 | - | - | - | $20,484 | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,127 | $2,564 |
$554
6,139
kWh
|
$573
-
kW-mo/yr
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $2,436 | $5,848 |
$1,566
17,492
kWh
|
$870
-
kW-mo/yr
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,342 | $4,848 |
$576
6,438
kWh
|
$766
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $447 | $2,408 |
$447
4,998
kWh
|
- | - | - | |
11 | 3.1162: Use less wasteful packaging | $2,285 | - | - | - | - | $2,285 | |
TOTAL RECOMMENDED | $51,632 | $60,837 |
$10,563
121,291
kWh
|
$5,233
-
kW-mo/yr
|
$13,067
-
MMBtu
|
$22,769 | ||
TOTAL IMPLEMENTED | $15,177 | $10,696 |
$2,400
30,159
kWh
|
$1,636
-
kW-mo/yr
|
$11,141
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs