ITAC Assessment: SU0433
ITAC logo
ITAC Assessment: SU0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Printed Circuit Boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 449
Plant Area 339,036
ft2
Annual Production 78,562
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,233,201 30,262,488
kWh
Electricity Demand $287,739 56,863
kW-mo/yr
Electricity Fees $36,099 -
Natural Gas $298,629 92,557
MMBtu
Waste Disposal Costs
Water Usage $454,803 181,280
Tgal
TOTAL YEARLY COSTS $2,310,471
RECOMMENDED SAVINGS* $91,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 3.1161: Eliminate/reduce an operation $16,596 $1,821 $(-20.0)
(-492)
kWh
$(-109.0)
-
kW-mo/yr
- - $1,725 $15,000
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $12,137 $1,162 $12,137
297,485
kWh
- - - - -
03 2.7135: Install occupancy sensors $2,678 $1,464 $2,678
65,631
kWh
- - - - -
04 3.4151: Minimize water usage $22,841 $23,500 - - - $22,841
-
Tgal
- -
05 2.7314: Reduce ventilation air $464 $489 $485
11,874
kWh
- $(-21.0)
-
MMBtu
- - -
06 2.2123: Insulate feedwater tank $21 $26 - - $21
-
MMBtu
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $565 $236
5,782
kWh
$40
-
kW-mo/yr
- - $110 $30
08 2.7142: Utilize higher efficiency lamps and/or ballasts $11,804 $18,859 $11,684
286,368
kWh
$2,368
-
kW-mo/yr
- - $134 $(-2,382.0)
09 3.1161: Eliminate/reduce an operation $23,968 $66,186 $4,879
119,570
kWh
$8,246
-
kW-mo/yr
$10,501
-
MMBtu
- $342 -
10 2.2136: Install / repair insulation on steam lines $84 $294 - - $84
-
MMBtu
- - -
11 2.6211: Conserve energy by efficient use of vending machines $268 $977 $268
6,570
kWh
- - - - -
TOTAL RECOMMENDED $91,277 $115,343 $32,347
792,788
kWh
$10,545
-
kW-mo/yr
$10,585
-
MMBtu
$22,841
-
Tgal
$2,311 $12,648
TOTAL IMPLEMENTED $43,215 $23,306 $26,479
648,992
kWh
$2,259
-
kW-mo/yr
- - $1,859 $12,618
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs