ITAC Assessment: MA0621
ITAC logo
ITAC Assessment: MA0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product electroplating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 72,000
ft2
Annual Production 10,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,457 2,920,320
kWh
Electricity Fees $3,705 -
Natural Gas $322,379 34,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,658

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $61,876 $354,790 $176,035
1,529,500
kWh
$(-101,835.0)
-
MMBtu
$(-12,324.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,424 $29,000 $11,320
106,800
kWh
$21,104
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $3,253 $10,000 - $3,253
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $646 $2,000 $646
6,100
kWh
- -
05 2.2122: Install / repair insulation on condensate lines $405 $280 - $405
-
MMBtu
-
TOTAL RECOMMENDED $98,604 $396,070 $188,001
1,642,400
kWh
$(-77,073.0)
-
MMBtu
$(-12,324.0)
TOTAL IMPLEMENTED $3,658 $10,280 - $3,658
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs