Assessment Year | 2007 |
---|---|
Principal Product | electroplating |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
72,000
ft2
|
Annual Production | 10,000
lb
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $308,457 | 2,920,320 |
kWh
|
$0.11 |
Electricity Fees | $3,705 | - |
|
- |
Natural Gas | $322,379 | 34,218 |
MMBtu
|
$9.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $98,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,658 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $61,876 | $354,790 |
$176,035
1,529,500
kWh
|
$(-101,835.0)
-
MMBtu
|
$(-12,324.0) | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,424 | $29,000 |
$11,320
106,800
kWh
|
$21,104
-
MMBtu
|
- | |
03 | 2.7224: Reduce space conditioning during non-working hours | $3,253 | $10,000 | - |
$3,253
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $646 | $2,000 |
$646
6,100
kWh
|
- | - | |
05 | 2.2122: Install / repair insulation on condensate lines | $405 | $280 | - |
$405
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $98,604 | $396,070 |
$188,001
1,642,400
kWh
|
$(-77,073.0)
-
MMBtu
|
$(-12,324.0) | ||
TOTAL IMPLEMENTED | $3,658 | $10,280 | - |
$3,658
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs