ITAC Assessment: IP0078
ITAC logo
ITAC Assessment: IP0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Adhesives
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 37,550
ft2
Annual Production 11,140,088
units
Production Hrs. Annual 5,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,571 382,300
kWh
Electricity Demand $21,263 1,293
kW-mo/yr
Electricity Fees $5,290 -
Natural Gas $8,939 1,066
MMBtu
Waste Disposal Costs
Water Usage $6,047 1,701,900
Tgal
TOTAL YEARLY COSTS $63,109
RECOMMENDED SAVINGS* $4,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,206

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $820 $4 $485
8,590
kWh
$335
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $2,032 $21 - - $2,032
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $320 $752 $180
3,200
kWh
$140
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,354 $3,396 $1,354
24,003
kWh
- -
TOTAL RECOMMENDED $4,526 $4,173 $2,019
35,793
kWh
$475
-
kW-mo/yr
$2,032
-
MMBtu
TOTAL IMPLEMENTED $4,206 $3,421 $1,839
32,593
kWh
$335
-
kW-mo/yr
$2,032
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs