ITAC Assessment: OR0232
ITAC logo
ITAC Assessment: OR0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Raw Dimensional
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 207,500
ft2
Annual Production 106,000
thousand feet
Production Hrs. Annual 3,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $458,166 9,181,126
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $75,256 $4,923 $75,256
1,600,821
kWh
02 2.4224: Upgrade controls on compressors $9,910 $1,200 $9,910
250,586
kWh
03 2.4239: Eliminate or reduce compressed air usage $2,778 $200 $2,778
70,633
kWh
04 2.7124: Make a practice of turning off lights when not needed $4,671 - $4,671
118,699
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,258 $3,360 $1,258
24,033
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,823 $37,075 $7,823
147,714
kWh
07 2.4133: Use most efficient type of electric motors $911 $4,478 $911
16,706
kWh
TOTAL RECOMMENDED $102,607 $51,236 $102,607
2,229,192
kWh
TOTAL IMPLEMENTED $80,203 $12,961 $80,203
1,712,193
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs