Assessment Year | 2003 |
---|---|
Principal Product | dry beverage products |
NAICS | 311352: Confectionery Manufacturing from Purchased Chocolate |
SIC | 2066: Chocolate and Cocoa Products |
Sales Range | $50 M to 100M |
# of Employees | 325 |
Plant Area |
600,000
ft2
|
Annual Production | 185,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $874,109 | 22,391,000 |
kWh
|
$0.039 |
Electricity Demand | $215,600 | 47,748 |
kW-mo/yr
|
$4.52 |
Natural Gas | $535,613 | 109,519 |
MMBtu
|
$4.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,364 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,438 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,493 | $910 |
$12,030
425,070
kWh
|
$3,463
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,181 | $1,942 |
$913
32,289
kWh
|
$268
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,631 | $17,891 |
$2,651
93,674
kWh
|
$980
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $2,897 | $6,565 |
$2,897
102,362
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,093 | $3,059 |
$849
29,967
kWh
|
$244
-
kW-mo/yr
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $730 | $514 |
$567
20,018
kWh
|
$163
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $755 | $333 |
$586
20,718
kWh
|
$169
-
kW-mo/yr
|
- | |
08 | 2.1213: Direct warmest air to combustion intake | $5,584 | $600 | - | - |
$5,584
-
MMBtu
|
|
TOTAL RECOMMENDED | $31,364 | $31,814 |
$20,493
724,098
kWh
|
$5,287
-
kW-mo/yr
|
$5,584
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,438 | $19,915 |
$15,248
538,762
kWh
|
$4,606
-
kW-mo/yr
|
$5,584
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs