ITAC Assessment: TT0004
ITAC logo
ITAC Assessment: TT0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 5,000
ft2
Annual Production 7,200,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,148 154,920
kWh
Electricity Demand $1,685 735
kW-mo/yr
Electricity Fees $338 -
Natural Gas $48,502 3,341
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,033

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $20,486 $2,500 - $20,486
-
MMBtu
02 2.2123: Insulate feedwater tank $654 $500 - $654
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,491 - - $1,491
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $402 - $402
49,609
kWh
-
05 2.2113: Repair or replace steam traps $557 - $557
13,711
kWh
-
TOTAL RECOMMENDED $23,590 $3,000 $959
63,320
kWh
$22,631
-
MMBtu
TOTAL IMPLEMENTED $23,033 $3,000 $402
49,609
kWh
$22,631
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs