Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other aluminum rolling, drawing, and extruding
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0206 #02 Y:2022 Apply for tax-free status for energy purchases $79,430 $1,500
UU0206 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $139,892 $110,800
MS0394 #03 Y:2022 Replace boiler $28,522 $145,930
MS0394 #02 Y:2022 Install / repair insulation on steam lines $22,395 $11,275
MS0394 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $29,140 $111,625
UU0196 #06 Y:2021 Install timers and/or thermostats $510 $640
UU0196 #05 Y:2021 Reduce the pressure of compressed air to the minimum required $779 $750
UU0196 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,096 $323
UU0196 #03 Y:2021 Install occupancy sensors $1,732 $7,647
UU0196 #02 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $2,577 $2,577
UU0196 #01 Y:2021 Check for accuracy of utility / power meters $10,923 $250
TR0023 #03 Y:2019 Meter waste water $7,020 $1,511
TR0023 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $9,401 $9,785
TR0023 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $13,791 $1,500
LS1912 #07 Y:2019 Utilize energy-efficient belts and other improved mechanisms $515 $1,198
LS1912 #06 Y:2019 Reduce the pressure of compressed air to the minimum required $1,657 $2,850
LS1912 #05 Y:2019 Utilize higher efficiency lamps and/or ballasts $42,700 $46,200
LS1912 #04 Y:2019 Install automatic packing equipment $1,164,856 $900,000
LS1912 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $11,179 $630
LS1912 #02 Y:2019 Utilize controls to operate equipment only when needed $4,767 $150