ITAC Assessment: MS0394
ITAC logo
ITAC Assessment: MS0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Copper and aluminum wire
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 460,000
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $786,983 17,970,600
kWh
Electricity Demand $376,354 32,406
kW-mo/yr
Natural Gas $232,085 46,574
MMBtu
TOTAL YEARLY COSTS $1,395,422
RECOMMENDED SAVINGS* $80,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29,140 $111,625 $28,096
638,540
kWh
$1,044
-
kW-mo/yr
-
02 2.2136: Install / repair insulation on steam lines $22,395 $11,275 - - $22,395
-
MMBtu
03 2.1224: Replace boiler $28,522 $145,930 - - $28,522
-
MMBtu
TOTAL RECOMMENDED $80,058 $268,830 $28,096
638,540
kWh
$1,044
-
kW-mo/yr
$50,918
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs