ITAC Assessment: AS0314
ITAC logo
ITAC Assessment: AS0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Precision aluminum extrusions
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 20,000
ft2
Annual Production 250,000
lb
Production Hrs. Annual 2,772
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,949 439,040
kWh
Electricity Demand $4,571 1,847
kW-mo/yr
Electricity Fees $3,070 -
Natural Gas $8,486 958
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7145: Install skylights $474 $996 $474
8,370
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $256 $751 $192
3,381
kWh
$64
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,375 $112 $6,308
111,293
kWh
$3,067
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $538 $30 $374
6,596
kWh
$164
-
kW-mo/yr
- - -
05 2.1121: Use insulation in furnaces to facilitate heating / cooling $283 $766 - - $283
-
MMBtu
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $142 $50 $142
2,496
kWh
- - - -
07 4.611: Begin a practice of predictive / preventative maintenance $11,340 $1,262 - - - - $11,340
08 4.513: Re-arrange equipment layout to reduce labor costs $1,055 $40 - - - - $1,055
09 4.521: Clear and rent existing space $38,822 $4,156 - - - - $38,822
10 4.445: Install equipment to move product $74,880 $1,732 - - - $74,880 -
TOTAL RECOMMENDED $137,165 $9,895 $7,490
132,136
kWh
$3,295
-
kW-mo/yr
$283
-
MMBtu
$74,880 $51,217
TOTAL IMPLEMENTED $62,002 $7,397 $7,490
132,136
kWh
$3,295
-
kW-mo/yr
- - $51,217
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs