Assessment Year | 1996 |
---|---|
Principal Product | Custom built air handlers |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
178,000
ft2
|
Annual Production | 400
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,673 | 1,783,998 |
kWh
|
$0.033 |
Electricity Demand | $54,454 | 6,508 |
kW-mo/yr
|
$8.37 |
Natural Gas | $18,681 | 4,324 |
MMBtu
|
$4.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,039 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,073 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $93 | $180 |
$31
879
kWh
|
$62
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $302 | $100 |
$31
879
kWh
|
$271
-
kW-mo/yr
|
- | - | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $414 | $600 | - | - |
$414
-
MMBtu
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $246 | $600 | - | - |
$246
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,518 | $9,807 |
$606
18,171
kWh
|
$912
-
kW-mo/yr
|
- | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $566 | $1,600 |
$1,094
40,152
kWh
|
$224
-
kW-mo/yr
|
$(-752.0)
-
MMBtu
|
- | - | |
07 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $4,700 | $1,800 | - | - | - |
$4,700
-
gal
|
- | |
08 | 3.5316: Contract a wood pallet recycling company | $200 | $100 | - | - | - | - |
$200
-
lb
|
|
TOTAL RECOMMENDED | $8,039 | $14,787 |
$1,762
60,081
kWh
|
$1,469
-
kW-mo/yr
|
$(-92.0)
-
MMBtu
|
$4,700
-
gal
|
$200
-
lb
|
||
TOTAL IMPLEMENTED | $1,073 | $2,380 |
$1,125
41,031
kWh
|
$286
-
kW-mo/yr
|
$(-338.0)
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs