ITAC Assessment: NC0080
ITAC logo
ITAC Assessment: NC0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Custom built air handlers
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 178,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,673 1,783,998
kWh
Electricity Demand $54,454 6,508
kW-mo/yr
Natural Gas $18,681 4,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.4239: Eliminate or reduce compressed air usage $93 $180 $31
879
kWh
$62
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $302 $100 $31
879
kWh
$271
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $414 $600 - - $414
-
MMBtu
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $246 $600 - - $246
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,518 $9,807 $606
18,171
kWh
$912
-
kW-mo/yr
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $566 $1,600 $1,094
40,152
kWh
$224
-
kW-mo/yr
$(-752.0)
-
MMBtu
- -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,700 $1,800 - - - $4,700
-
gal
-
08 3.5316: Contract a wood pallet recycling company $200 $100 - - - - $200
-
lb
TOTAL RECOMMENDED $8,039 $14,787 $1,762
60,081
kWh
$1,469
-
kW-mo/yr
$(-92.0)
-
MMBtu
$4,700
-
gal
$200
-
lb
TOTAL IMPLEMENTED $1,073 $2,380 $1,125
41,031
kWh
$286
-
kW-mo/yr
$(-338.0)
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs