ITAC Assessment: IA0060
ITAC logo
ITAC Assessment: IA0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product popcorn
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,223 2,701,055
kWh
Natural Gas $26,768 5,405
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $9,999 $4,200 - $9,999
02 2.4133: Use most efficient type of electric motors $4,753 $17,295 $4,753
97,011
kWh
-
03 2.3212: Optimize plant power factor $2,045 $11,207 $2,045
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,192 $86 $1,192
24,326
kWh
-
05 2.7135: Install occupancy sensors $879 $2,359 $879
17,878
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $742 $460 $742
15,240
kWh
-
07 2.8121: Apply for tax-free status for energy purchases $243 $200 - $243
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $160 $294 $160
3,224
kWh
-
TOTAL RECOMMENDED $20,013 $36,101 $9,771
157,679
kWh
$10,242
TOTAL IMPLEMENTED $16,929 $22,241 $6,687
136,577
kWh
$10,242
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs