| Assessment Year | 2019 |
|---|---|
| Principal Product | Aluminum Extrusion Alloys |
| NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $10 M to 50M |
| # of Employees | 206 |
| Plant Area |
232,000
ft2
|
| Annual Production | 11,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $581,892 | 6,617,244 |
kWh
|
$0.088 | |
| Natural Gas | $169,984 | 30,362 |
MMBtu
|
$5.60 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,506 | 761 |
Tgal
|
$3.29 | |
| TOTAL YEARLY COSTS | $754,382 | ||||
| RECOMMENDED SAVINGS* | $1,227,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,696 | $50 |
$1,696
19,291
kWh
|
- | |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $4,767 | $150 |
$4,767
54,212
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,179 | $630 |
$11,179
127,125
kWh
|
- | |
| 04 | 4.441: Install automatic packing equipment | $1,164,856 | $900,000 |
$(-5,144.0)
(-58,500)
kWh
|
$1,170,000 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,700 | $46,200 |
$42,700
485,578
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,657 | $2,850 |
$1,657
18,841
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $515 | $1,198 |
$515
5,854
kWh
|
- | |
| TOTAL RECOMMENDED | $1,227,370 | $951,078 |
$57,370
652,401
kWh
|
$1,170,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs