ITAC Assessment: TT0278
ITAC logo
ITAC Assessment: TT0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Fuel and Oil Filtration Products
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 414
Plant Area 338,958
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 5,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,834 3,698,400
kWh
Electricity Demand $97,853 6,792
kW-mo/yr
Natural Gas $56,511 5,584
MMBtu
LPG $3,151 95
MMBtu
Waste Disposal Costs
Water Usage $5,389 1,969
Tgal
Water Disposal $5,420 1,969
Tgal
TOTAL YEARLY COSTS $407,158
RECOMMENDED SAVINGS* $71,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,871

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,020 $107,478 $21,038
325,669
kWh
$2,982
-
kW-mo/yr
- - -
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $14,885 $400 $938
14,524
kWh
- $13,947
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,152 $1,500 $8,781
135,929
kWh
$3,371
-
kW-mo/yr
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $5,912 $18,000 $4,505
69,732
kWh
$547
-
kW-mo/yr
$860
-
MMBtu
- -
05 2.7261: Install timers and/or thermostats $4,507 $150 $2,921
45,219
kWh
$(-72.0)
-
kW-mo/yr
$1,658
-
MMBtu
- -
06 2.6218: Turn off equipment when not in use $4,143 - $4,143
62,128
kWh
- - - -
07 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,425 - $(-506.0)
(-7,833)
kWh
- - $3,151
-
MMBtu
$780
08 2.4237: Substitute compressed air cooling with water or air cooling $2,362 $2,736 $2,362
36,555
kWh
- - - -
TOTAL RECOMMENDED $71,406 $130,264 $44,182
681,923
kWh
$6,828
-
kW-mo/yr
$16,465
-
MMBtu
$3,151
-
MMBtu
$780
TOTAL IMPLEMENTED $47,871 $129,714 $36,180
560,052
kWh
$6,900
-
kW-mo/yr
$860
-
MMBtu
$3,151
-
MMBtu
$780
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs