ITAC Assessment: TR0023
ITAC logo
ITAC Assessment: TR0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Aluminum tubing
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 57,200
ft2
Annual Production 11,124,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,494 3,298,320
kWh
Electricity Demand $100,061 10,008
kW-mo/yr
Electricity Fees $2,383 -
Natural Gas $117,144 18,525
MMBtu
Waste Disposal Costs
Water Usage $4,119 1,987
Tgal
Water Disposal $7,801 1,987
Tgal
TOTAL YEARLY COSTS $398,002
RECOMMENDED SAVINGS* $30,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,212

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,791 $1,500 $10,037
195,268
kWh
$3,754
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,401 $9,785 $6,842
133,119
kWh
$2,559
-
kW-mo/yr
-
03 3.4155: Meter waste water $7,020 $1,511 - - $7,020
-
Tgal
TOTAL RECOMMENDED $30,212 $12,796 $16,879
328,387
kWh
$6,314
-
kW-mo/yr
$7,020
-
Tgal
TOTAL IMPLEMENTED $30,212 $12,796 $16,879
328,387
kWh
$6,314
-
kW-mo/yr
$7,020
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs