matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0822 #03 Y:2025 | 03 | 2025 | Optimize plant power factor | $16,211 | $80,309 |
n/a
|
| OR0822 #02 Y:2025 | 02 | 2025 | Use waste heat from flue gases to heat space conditioning air | $3,864 | $121,611 |
n/a
|
| OR0822 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $7,339 | $36,541 |
n/a
|
| OR0810 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $82,382 | $1,300,527 |
n/a
|
| OR0810 #02 Y:2025 | 02 | 2025 | Eliminate or reduce compressed air usage | $1,702 | $1,080 |
n/a
|
| OR0810 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,031 | $626 |
n/a
|
| OR0789 #05 Y:2024 | 05 | 2024 | Install common header on compressors | $16,245 | $4,904 | |
| OR0789 #04 Y:2024 | 04 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $985 | - | |
| OR0789 #03 Y:2024 | 03 | 2024 | Replace fossil fuel equipment with electrical equipment | $4,115 | $1,800 | |
| OR0789 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $1,616 | $14,338 | |
| OR0789 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $4,513 | - | |
| OR0716 #07 Y:2018 | 07 | 2018 | Use waste heat from hot flue gases to preheat | $5,641 | $23,504 | |
| OR0716 #06 Y:2018 | 06 | 2018 | Optimize plant power factor | $9,287 | $19,796 | |
| OR0716 #05 Y:2018 | 05 | 2018 | Reduce the pressure of compressed air to the minimum required | $11,971 | $1,200 | |
| OR0716 #04 Y:2018 | 04 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,289 | $1,500 | |
| OR0716 #03 Y:2018 | 03 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $22,967 | $10,000 | |
| OR0716 #02 Y:2018 | 02 | 2018 | Adjust / maintain fork lift trucks for most efficient operation | $96,953 | $165,004 | |
| OR0716 #01 Y:2018 | 01 | 2018 | Purchase new equipment to reduce material use / cost | $170,737 | $8,015 | |
| OR0684 #08 Y:2017 | 08 | 2017 | Purchase equipment instead of leasing | $156,346 | $600,000 | |
| OR0684 #07 Y:2017 | 07 | 2017 | Use cooling tower or economizer to replace chiller cooling | $41,279 | $86,043 |