ITAC Assessment: OR0789
ITAC logo
ITAC Assessment: OR0789
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Recycled sorted metal
NAICS 331491: Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 54
Plant Area 117,000
ft2
Annual Production 18,000
ton
Production Hrs. Annual 2,600
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,000 1,258,640
kWh
Electricity Demand $112,944 9,556
kW-mo/yr
Electricity Fees $31,217 -
Natural Gas $3,472 272
MMBtu
Fuel Oil #1 $4,278 126
MMBtu
Waste Disposal Costs
Water Usage $946 105
Tgal
Water Disposal $1,748 106
Tgal
TOTAL YEARLY COSTS $249,605
RECOMMENDED SAVINGS* $27,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,498

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,513 - $4,513
59,792
kWh
- - -
02 2.3212: Optimize plant power factor $1,616 $14,338 - - - $1,616
03 2.1321: Replace fossil fuel equipment with electrical equipment $4,115 $1,800 $(-163.0)
(-2,162)
kWh
- $4,278
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $985 - $564
7,470
kWh
$421
-
kW-mo/yr
- -
05 2.4225: Install common header on compressors $16,245 $4,904 $2,636
34,923
kWh
$13,609
-
kW-mo/yr
- -
TOTAL RECOMMENDED $27,474 $21,042 $7,550
100,023
kWh
$14,030
-
kW-mo/yr
$4,278
-
MMBtu
$1,616
TOTAL IMPLEMENTED $5,498 - $5,077
67,262
kWh
$421
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs