ITAC Assessment: OR0716
ITAC logo
ITAC Assessment: OR0716
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Aluminum Extrusion
NAICS 331315: Aluminum Sheet, Plate, and Foil Manufacturing
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 101,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $920,519 16,623,640
kWh
Electricity Demand $406,468 45,784
kW-mo/yr
Electricity Fees $14,665 -
Natural Gas $456,194 154,740
MMBtu
LPG $272,866 10,535
MMBtu
TOTAL YEARLY COSTS $2,070,712
RECOMMENDED SAVINGS* $336,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Administrative Changes Savings Primary Raw Material Savings
01 4.132: Purchase new equipment to reduce material use / cost $170,737 $8,015 $(-1,460.0)
(-25,037)
kWh
$(-486.0)
-
kW-mo/yr
- - - $4,680 $168,003
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $96,953 $165,004 $(-11,678.0)
(-200,232)
kWh
$(-10,006.0)
-
kW-mo/yr
- - $118,637
-
MMBtu
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,967 $10,000 $18,915
324,327
kWh
$4,052
-
kW-mo/yr
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,289 $1,500 $15,886
272,387
kWh
$3,403
-
kW-mo/yr
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $11,971 $1,200 $11,971
205,256
kWh
- - - - - -
06 2.3212: Optimize plant power factor $9,287 $19,796 - - $9,287 - - - -
07 2.2414: Use waste heat from hot flue gases to preheat $5,641 $23,504 - - - $5,641
-
MMBtu
- - -
TOTAL RECOMMENDED $336,845 $229,019 $33,634
576,701
kWh
$(-3,037.0)
-
kW-mo/yr
$9,287 $5,641
-
MMBtu
$118,637
-
MMBtu
$4,680 $168,003
TOTAL IMPLEMENTED $151,180 $177,704 $35,094
601,738
kWh
$(-2,551.0)
-
kW-mo/yr
- - $118,637
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs