Assessment Year | 2019 |
---|---|
Principal Product | Aluminum Extrusion |
NAICS | 331315: Aluminum Sheet, Plate, and Foil Manufacturing |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
101,000
ft2
|
Annual Production | 80,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $920,519 | 16,623,640 |
kWh
|
$0.055 |
Electricity Demand | $406,468 | 45,784 |
kW-mo/yr
|
$8.88 |
Electricity Fees | $14,665 | - |
|
- |
Natural Gas | $456,194 | 154,740 |
MMBtu
|
$2.95 |
LPG | $272,866 | 10,535 |
MMBtu
|
$25.90 |
TOTAL YEARLY COSTS | $2,070,712 | |||
RECOMMENDED SAVINGS* | $336,845 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $151,180 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.132: Purchase new equipment to reduce material use / cost | $170,737 | $8,015 |
$(-1,460.0)
(-25,037)
kWh
|
$(-486.0)
-
kW-mo/yr
|
- | - | - | $4,680 | $168,003 | |
02 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $96,953 | $165,004 |
$(-11,678.0)
(-200,232)
kWh
|
$(-10,006.0)
-
kW-mo/yr
|
- | - |
$118,637
-
MMBtu
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,967 | $10,000 |
$18,915
324,327
kWh
|
$4,052
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,289 | $1,500 |
$15,886
272,387
kWh
|
$3,403
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,971 | $1,200 |
$11,971
205,256
kWh
|
- | - | - | - | - | - | |
06 | 2.3212: Optimize plant power factor | $9,287 | $19,796 | - | - | $9,287 | - | - | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $5,641 | $23,504 | - | - | - |
$5,641
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $336,845 | $229,019 |
$33,634
576,701
kWh
|
$(-3,037.0)
-
kW-mo/yr
|
$9,287 |
$5,641
-
MMBtu
|
$118,637
-
MMBtu
|
$4,680 | $168,003 | ||
TOTAL IMPLEMENTED | $151,180 | $177,704 |
$35,094
601,738
kWh
|
$(-2,551.0)
-
kW-mo/yr
|
- | - |
$118,637
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs