Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Battery manufacturer
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range less than $500
k
# of Employees 22
Plant Area 38,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,768 663,180
kWh
Electricity Demand $27,677 3,295
kW-mo/yr
Natural Gas $20,835 2,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 3.4155: Meter waste water $2,560 $3,650 - - $2,560
-
Tgal
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,195 $331 $3,195
58,091
kWh
- - -
03 4.515: Install shelves / racks to utilize unused space $4,177 $3,116 $187
3,195
kWh
- - $3,990
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,817 $56 - $1,817
-
kW-mo/yr
- -
05 4.424: Improve space comfort conditioning $6,250 $3,000 - - - $6,250
TOTAL RECOMMENDED $17,999 $10,153 $3,382
61,286
kWh
$1,817
-
kW-mo/yr
$2,560
-
Tgal
$10,240
TOTAL IMPLEMENTED - - - - - -