Assessment Year | 2022 |
---|---|
Principal Product | HDPE extruded parts |
NAICS | 332313: Plate Work Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $50 M to 100M |
# of Employees | 76 |
Plant Area |
88,400
ft2
|
Annual Production | 70,000,000
lb
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,224,929 | 20,909,480 |
kWh
|
$0.059 | |
Electricity Demand | $221,679 | 37,348 |
kW-mo/yr
|
$5.94 | |
Natural Gas | $2,629 | 194 |
MMBtu
|
$13.55 | |
Waste Disposal Costs | |||||
Water Usage | $13,771 | 4,082 |
Tgal
|
$3.37 | |
Water Disposal | $13,177 | 4,082 |
Tgal
|
$3.23 | |
TOTAL YEARLY COSTS | $1,476,185 | ||||
RECOMMENDED SAVINGS* | $28,043 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $15,808 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $10,092 | $12,000 |
$10,092
171,053
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,821 | $240 |
$2,198
37,247
kWh
|
$623
-
kW-mo/yr
|
|
03 | 2.4239: Eliminate or reduce compressed air usage | $1,470 | $9,762 |
$1,152
19,533
kWh
|
$318
-
kW-mo/yr
|
|
04 | 2.4239: Eliminate or reduce compressed air usage | $12,708 | $15,605 |
$9,952
168,684
kWh
|
$2,756
-
kW-mo/yr
|
|
05 | 2.2511: Insulate bare equipment | $375 | $389 |
$294
4,976
kWh
|
$81
-
kW-mo/yr
|
|
06 | 2.4237: Substitute compressed air cooling with water or air cooling | $298 | $1,226 |
$298
5,122
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $279 | $360 |
$279
4,723
kWh
|
- | |
TOTAL RECOMMENDED | $28,043 | $39,582 |
$24,265
411,338
kWh
|
$3,778
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $15,808 | $16,205 |
$12,429
210,654
kWh
|
$3,379
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs