ITAC Assessment: MZ0320
ITAC logo
ITAC Assessment: MZ0320
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product HDPE extruded parts
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 76
Plant Area 88,400
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 4,368
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,224,929 20,909,480
kWh
Electricity Demand $221,679 37,348
kW-mo/yr
Natural Gas $2,629 194
MMBtu
Waste Disposal Costs
Water Usage $13,771 4,082
Tgal
Water Disposal $13,177 4,082
Tgal
TOTAL YEARLY COSTS $1,476,185
RECOMMENDED SAVINGS* $28,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,808

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $10,092 $12,000 $10,092
171,053
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,821 $240 $2,198
37,247
kWh
$623
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $1,470 $9,762 $1,152
19,533
kWh
$318
-
kW-mo/yr
04 2.4239: Eliminate or reduce compressed air usage $12,708 $15,605 $9,952
168,684
kWh
$2,756
-
kW-mo/yr
05 2.2511: Insulate bare equipment $375 $389 $294
4,976
kWh
$81
-
kW-mo/yr
06 2.4237: Substitute compressed air cooling with water or air cooling $298 $1,226 $298
5,122
kWh
-
07 2.7135: Install occupancy sensors $279 $360 $279
4,723
kWh
-
TOTAL RECOMMENDED $28,043 $39,582 $24,265
411,338
kWh
$3,778
-
kW-mo/yr
TOTAL IMPLEMENTED $15,808 $16,205 $12,429
210,654
kWh
$3,379
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs