ITAC Assessment: OR0390
ITAC logo
ITAC Assessment: OR0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aluminum/Steel Boxes
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 36,000
pieces
Production Hrs. Annual 4,498
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,888 982,300
kWh
Electricity Demand $12,260 2,652
kW-mo/yr
Electricity Fees $2,555 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,355 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings Primary Product Savings
01 4.132: Purchase new equipment to reduce material use / cost $79,800 $30,700 - - - $13,350 $66,450
02 2.3212: Optimize plant power factor $2,467 $2,100 - - $2,467 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,749 $1,700 $1,286
35,225
kWh
$463
-
kW-mo/yr
- - -
04 2.4226: Use / purchase optimum sized compressor $3,277 $2,100 $2,408
65,975
kWh
$869
-
kW-mo/yr
- - -
05 2.8112: Combine utility meters $1,062 $3,925 - $(-985.0)
-
kW-mo/yr
$2,047 - -
TOTAL RECOMMENDED $88,355 $40,525 $3,694
101,200
kWh
$347
-
kW-mo/yr
$4,514 $13,350 $66,450
TOTAL IMPLEMENTED $84,826 $34,500 $3,694
101,200
kWh
$1,332
-
kW-mo/yr
- $13,350 $66,450