ITAC Assessment: DL0121
ITAC logo
ITAC Assessment: DL0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product newspapers
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $500
k
to 1
M
# of Employees 100
Plant Area 86,395
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,497 4,835,645
kWh
Natural Gas $20,493 2,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $31,300 - $31,300
447,000
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $5,700 - $5,700
81,200
kWh
-
03 2.7229: Air condition only space necessary $22,620 $750 $22,620
323,200
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,400 $13,500 $19,400
278,000
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $7,400 $28,000 - $7,400
-
MMBtu
06 2.2437: Recover waste heat from equipment $4,750 $1,300 $1,850
26,500
kWh
$2,900
-
MMBtu
07 2.2437: Recover waste heat from equipment $4,960 $1,400 $4,960
70,900
kWh
-
08 2.7135: Install occupancy sensors $3,460 $3,210 $3,460
49,400
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $11,200 $18,600 $11,200
160,000
kWh
-
10 2.6218: Turn off equipment when not in use $1,830 - $460
6,540
kWh
$1,370
-
MMBtu
TOTAL RECOMMENDED $112,620 $66,760 $100,950
1,442,740
kWh
$11,670
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs