Assessment Year | 2017 |
---|---|
Principal Product | Aluminum Extrusions |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
143,000
ft2
|
Annual Production | 39,700,000
lb
|
Production Hrs. Annual | 8,670
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $919,929 | 17,073,820 |
kWh
|
$0.054 | |
Electricity Demand | $360,931 | 45,060 |
kW-mo/yr
|
$8.01 | |
Electricity Fees | $99,412 | - |
|
- | |
Natural Gas | $167,349 | 33,432 |
MMBtu
|
$5.01 | |
Waste Disposal Costs | |||||
Solid Waste (non-haz) | $268,800 | 7,440,000 |
lb
|
$0.036 | |
TOTAL YEARLY COSTS | $1,816,421 | ||||
RECOMMENDED SAVINGS* | $456,570 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $295,043 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,985 | $500 |
$2,325
41,986
kWh
|
$660
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.1113: Reduce combustion air flow to optimum | $17,412 | $20,340 | - | - |
$17,412
-
MMBtu
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $2,196 | $1,831 |
$2,196
39,645
kWh
|
- | - | - | - | - | - | |
04 | 2.1113: Reduce combustion air flow to optimum | $1,832 | $670 | - | - |
$1,832
-
MMBtu
|
- | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $5,474 | $8,100 |
$5,474
98,842
kWh
|
- | - | - | - | - | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $229,046 | $405,000 |
$(-11,845.0)
(-235,164)
kWh
|
$(-2,964.0)
-
kW-mo/yr
|
$(-24,945.0)
-
MMBtu
|
- |
$268,800
-
lb
|
- | - | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $41,279 | $86,043 |
$(-21,460.0)
(-387,510)
kWh
|
$(-11,661.0)
-
kW-mo/yr
|
- |
$74,400
-
Tgal
|
- | - | - | |
08 | 4.231: Purchase equipment instead of leasing | $156,346 | $600,000 |
$(-11,032.0)
(-199,200)
kWh
|
$(-8,611.0)
-
kW-mo/yr
|
- | - | - | $(-124,011.0) | $300,000 | |
TOTAL RECOMMENDED | $456,570 | $1,122,484 |
$(-34,342.0)
(-641,401)
kWh
|
$(-22,576.0)
-
kW-mo/yr
|
$(-5,701.0)
-
MMBtu
|
$74,400
-
Tgal
|
$268,800
-
lb
|
$(-124,011.0) | $300,000 | ||
TOTAL IMPLEMENTED | $295,043 | $520,153 |
$(-27,831.0)
(-523,832)
kWh
|
$(-14,625.0)
-
kW-mo/yr
|
$(-5,701.0)
-
MMBtu
|
$74,400
-
Tgal
|
$268,800
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs