ITAC Assessment: OR0684
ITAC logo
ITAC Assessment: OR0684
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aluminum Extrusions
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 143,000
ft2
Annual Production 39,700,000
lb
Production Hrs. Annual 8,670
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $919,929 17,073,820
kWh
Electricity Demand $360,931 45,060
kW-mo/yr
Electricity Fees $99,412 -
Natural Gas $167,349 33,432
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $268,800 7,440,000
lb
TOTAL YEARLY COSTS $1,816,421
RECOMMENDED SAVINGS* $456,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $295,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,985 $500 $2,325
41,986
kWh
$660
-
kW-mo/yr
- - - - -
02 2.1113: Reduce combustion air flow to optimum $17,412 $20,340 - - $17,412
-
MMBtu
- - - -
03 2.2511: Insulate bare equipment $2,196 $1,831 $2,196
39,645
kWh
- - - - - -
04 2.1113: Reduce combustion air flow to optimum $1,832 $670 - - $1,832
-
MMBtu
- - - -
05 2.6218: Turn off equipment when not in use $5,474 $8,100 $5,474
98,842
kWh
- - - - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $229,046 $405,000 $(-11,845.0)
(-235,164)
kWh
$(-2,964.0)
-
kW-mo/yr
$(-24,945.0)
-
MMBtu
- $268,800
-
lb
- -
07 2.2614: Use cooling tower or economizer to replace chiller cooling $41,279 $86,043 $(-21,460.0)
(-387,510)
kWh
$(-11,661.0)
-
kW-mo/yr
- $74,400
-
Tgal
- - -
08 4.231: Purchase equipment instead of leasing $156,346 $600,000 $(-11,032.0)
(-199,200)
kWh
$(-8,611.0)
-
kW-mo/yr
- - - $(-124,011.0) $300,000
TOTAL RECOMMENDED $456,570 $1,122,484 $(-34,342.0)
(-641,401)
kWh
$(-22,576.0)
-
kW-mo/yr
$(-5,701.0)
-
MMBtu
$74,400
-
Tgal
$268,800
-
lb
$(-124,011.0) $300,000
TOTAL IMPLEMENTED $295,043 $520,153 $(-27,831.0)
(-523,832)
kWh
$(-14,625.0)
-
kW-mo/yr
$(-5,701.0)
-
MMBtu
$74,400
-
Tgal
$268,800
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs