ITAC Assessment: OR0822
ITAC logo
ITAC Assessment: OR0822
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product aluminum extrusions
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 600
Plant Area 145,693
ft2
Annual Production 140,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,463,034 20,207,920
kWh
Electricity Demand $751,780 64,846
kW-mo/yr
Electricity Fees $132,212 -
Natural Gas $162,023 93,781
MMBtu
TOTAL YEARLY COSTS $2,509,049
RECOMMENDED SAVINGS* $27,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,339 $36,541 $6,019
83,132
kWh
$1,320
-
kW-mo/yr
- -
02 2.2426: Use waste heat from flue gases to heat space conditioning air $3,864 $121,611 - - - $3,864
-
MMBtu
03 2.3212: Optimize plant power factor $16,211 $80,309 - - $16,211 -
TOTAL RECOMMENDED $27,414 $238,461 $6,019
83,132
kWh
$1,320
-
kW-mo/yr
$16,211 $3,864
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs