ITAC Assessment: OR0548
ITAC logo
ITAC Assessment: OR0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Plywood
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 1,000,000
ft2
Annual Production 150,000
thousand feet
Production Hrs. Annual 7,448
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,836,527 48,920,000
kWh
Electricity Demand $389,319 104,272
kW-mo/yr
Natural Gas $28,421 1,025
MMBtu
Wood $1,500,000 900,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $407,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
01 2.6126: Keep solid fuels / raw materials dry $294,300 $290,000 - - $294,300
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $47,605 $128,300 $38,182
979,274
kWh
$9,423
-
kW-mo/yr
- -
03 2.7243: Improve air circulation with destratification fans / other methods $21,000 $8,800 $21,000
540,220
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,295 - $12,502
320,653
kWh
$2,793
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,882 $9,900 $8,684
222,724
kWh
$1,198
-
kW-mo/yr
- -
06 2.7131: Add area lighting switches $8,092 $1,600 $5,592
143,430
kWh
- - $2,500
07 2.4224: Upgrade controls on compressors $7,349 - $7,349
188,479
kWh
- - -
08 2.2136: Install / repair insulation on steam lines $3,500 $600 - - $3,500
-
MMBtu
-
TOTAL RECOMMENDED $407,023 $439,200 $93,309
2,394,780
kWh
$13,414
-
kW-mo/yr
$297,800
-
MMBtu
$2,500
TOTAL IMPLEMENTED $83,631 $138,800 $66,717
1,711,130
kWh
$13,414
-
kW-mo/yr
$3,500
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs