Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2308 #05 Y:2023 Improve combustion control capability $47,887 $200,000
UW2308 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $206 $1,815
UW2308 #03 Y:2023 Install storm windows and doors $145 $1,901
UW2308 #02 Y:2023 Improve air circulation with destratification fans / other methods $491 $1,096
UW2308 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $1,223 -
UW2305 #04 Y:2023 Reduce space conditioning during non-working hours $1,031 -
UW2305 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $1,115 $5,102
UW2305 #02 Y:2023 Replace dc equipment with ac equipment $3,266 $4,565
UW2305 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $704 $4,074
OR0724 #05 Y:2019 Reduce the pressure of compressed air to the minimum required $2,462 $218
OR0724 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $4,637 $3,836
OR0724 #03 Y:2019 Repair and eliminate steam leaks $49,629 $100,000
OR0724 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $7,124 $3,891
OR0724 #01 Y:2019 Optimize plant power factor $10,104 $18,004
BS0061 #04 Y:2015 Size electric motors for peak operating efficiency $871 $2,550
BS0061 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $223 $702
BS0061 #02 Y:2015 Use waste heat from hot flue gases to preheat $1,959 $5,665
BS0061 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $13,605 $74,360
OR0597 #04 Y:2012 Install occupancy sensors $3,853 $3,853
OR0597 #03 Y:2012 Utilize energy-efficient belts and other improved mechanisms $11,892 $11,892