ITAC Assessment: BS0061
ITAC logo
ITAC Assessment: BS0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Rock, Sand, Gravel, Concrete, and Asphalt
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 9,000,000
ft2
Annual Production 1,121,215
ton
Production Hrs. Annual 2,600
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,787 2,612,420
kWh
Electricity Demand $126,270 17,316
kW-mo/yr
Natural Gas $143,931 26,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,605 $74,360 $10,601
147,233
kWh
$3,004
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $1,959 $5,665 - - $1,959
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $223 $702 $196
2,719
kWh
$27
-
kW-mo/yr
-
04 2.4131: Size electric motors for peak operating efficiency $871 $2,550 $346
4,800
kWh
$525
-
kW-mo/yr
-
TOTAL RECOMMENDED $16,658 $83,277 $11,143
154,752
kWh
$3,556
-
kW-mo/yr
$1,959
-
MMBtu
TOTAL IMPLEMENTED $13,828 $75,062 $10,797
149,952
kWh
$3,031
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs