ITAC Assessment: MO0031
ITAC logo
ITAC Assessment: MO0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ELECTRIC MOTORS
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 240,000
pieces
Production Hrs. Annual 5,355
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $705,921 14,436,694
kWh
LPG $96,901 18,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $136,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $100,106 - $744
15,240
kWh
$99,362
02 2.7447: Install vinyl strip / high speed / air curtain doors $20,310 $4,398 $20,310
415,299
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $9,336 $11,725 $9,336
191,090
kWh
-
04 2.7492: Use proper thickness of insulation on building envelope $887 $656 $887
18,171
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,595 - $3,095
63,306
kWh
$(-500.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $683 $1,720 $683
14,068
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $2,090 $400 $2,090
42,790
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $373 - $373
7,620
kWh
-
TOTAL RECOMMENDED $136,380 $18,899 $37,518
767,584
kWh
$98,862
TOTAL IMPLEMENTED $136,380 $18,899 $37,518
767,584
kWh
$98,862
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs