ITAC Assessment: MI0400
ITAC logo
ITAC Assessment: MI0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Food Products
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 385,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,133 5,099,256
kWh
Electricity Demand $116,364 12,708
kW-mo/yr
Electricity Fees $35,282 -
Natural Gas $32,103 8,116
MMBtu
TOTAL YEARLY COSTS $494,882
RECOMMENDED SAVINGS* $49,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,401

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7425: Clean or color roof to reduce solar load $13,967 $34,488 $6,696
109,770
kWh
$7,271
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,855 $11,226 $6,518
106,853
kWh
$1,337
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $5,931 $3,518 $5,931
97,229
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $5,597 $320 $4,571
74,941
kWh
$1,026
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $5,218 $1,980 $1,976
32,398
kWh
$3,242
-
kW-mo/yr
-
06 2.3132: Recharge batteries on during off-peak demand periods $4,615 $1,827 - $4,615
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,897 $1,980 $1,187
19,463
kWh
$2,710
-
kW-mo/yr
-
08 2.8112: Combine utility meters $2,837 $100 - - $2,837
TOTAL RECOMMENDED $49,917 $55,439 $26,879
440,654
kWh
$20,201
-
kW-mo/yr
$2,837
TOTAL IMPLEMENTED $18,401 $16,571 $12,449
204,082
kWh
$5,952
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs