| Assessment Year | 2023 |
|---|---|
| Principal Product | Warm Mix and Hot Mix Asphalt |
| NAICS | 327320: Ready-Mix Concrete Manufacturing |
| SIC | 3273: Ready-Mixed Concrete |
| Sales Range | $10 M to 50M |
| # of Employees | 8 |
| Plant Area |
61,828
ft2
|
| Annual Production | 250,000
ton
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $88,580 | 1,088,833 |
kWh
|
$0.081 |
| Electricity Demand | $23,226 | 6,082 |
kW-mo/yr
|
$3.82 |
| Electricity Fees | $1,186 | - |
|
- |
| Natural Gas | $239,436 | 40,724 |
MMBtu
|
$5.88 |
| TOTAL YEARLY COSTS | $352,428 | |||
| RECOMMENDED SAVINGS* | $86,587 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $86,587 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,223 | - |
$986
12,123
kWh
|
$237
-
kW-mo/yr
|
- | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $491 | $1,096 |
$491
6,031
kWh
|
- | - | |
| 03 | 2.7494: Install storm windows and doors | $145 | $1,901 |
$134
1,647
kWh
|
$11
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $206 | $1,815 |
$152
1,866
kWh
|
$54
-
kW-mo/yr
|
- | |
| 05 | 2.1116: Improve combustion control capability | $47,887 | $200,000 | - | - |
$47,887
-
MMBtu
|
|
| 06 | 2.5195: Change product design to reduce energy requirements | $36,635 | - | - | - |
$36,635
-
MMBtu
|
|
| TOTAL RECOMMENDED | $86,587 | $204,812 |
$1,763
21,667
kWh
|
$302
-
kW-mo/yr
|
$84,522
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $86,587 | $204,812 |
$1,763
21,667
kWh
|
$302
-
kW-mo/yr
|
$84,522
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs