ITAC Assessment: UW2308
ITAC logo
ITAC Assessment: UW2308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Warm Mix and Hot Mix Asphalt
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 8
Plant Area 61,828
ft2
Annual Production 250,000
ton
Production Hrs. Annual 2,340
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,580 1,088,833
kWh
Electricity Demand $23,226 6,082
kW-mo/yr
Electricity Fees $1,186 -
Natural Gas $239,436 40,724
MMBtu
TOTAL YEARLY COSTS $352,428
RECOMMENDED SAVINGS* $86,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,587

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,223 - $986
12,123
kWh
$237
-
kW-mo/yr
-
02 2.7243: Improve air circulation with destratification fans / other methods $491 $1,096 $491
6,031
kWh
- -
03 2.7494: Install storm windows and doors $145 $1,901 $134
1,647
kWh
$11
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $206 $1,815 $152
1,866
kWh
$54
-
kW-mo/yr
-
05 2.1116: Improve combustion control capability $47,887 $200,000 - - $47,887
-
MMBtu
06 2.5195: Change product design to reduce energy requirements $36,635 - - - $36,635
-
MMBtu
TOTAL RECOMMENDED $86,587 $204,812 $1,763
21,667
kWh
$302
-
kW-mo/yr
$84,522
-
MMBtu
TOTAL IMPLEMENTED $86,587 $204,812 $1,763
21,667
kWh
$302
-
kW-mo/yr
$84,522
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs