Assessment Year | 2023 |
---|---|
Principal Product | Warm Mix and Hot Mix Asphalt |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 8 |
Plant Area |
61,828
ft2
|
Annual Production | 250,000
ton
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $88,580 | 1,088,833 |
kWh
|
$0.081 |
Electricity Demand | $23,226 | 6,082 |
kW-mo/yr
|
$3.82 |
Electricity Fees | $1,186 | - |
|
- |
Natural Gas | $239,436 | 40,724 |
MMBtu
|
$5.88 |
TOTAL YEARLY COSTS | $352,428 | |||
RECOMMENDED SAVINGS* | $86,587 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $86,587 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,223 | - |
$986
12,123
kWh
|
$237
-
kW-mo/yr
|
- | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $491 | $1,096 |
$491
6,031
kWh
|
- | - | |
03 | 2.7494: Install storm windows and doors | $145 | $1,901 |
$134
1,647
kWh
|
$11
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $206 | $1,815 |
$152
1,866
kWh
|
$54
-
kW-mo/yr
|
- | |
05 | 2.1116: Improve combustion control capability | $47,887 | $200,000 | - | - |
$47,887
-
MMBtu
|
|
06 | 2.5195: Change product design to reduce energy requirements | $36,635 | - | - | - |
$36,635
-
MMBtu
|
|
TOTAL RECOMMENDED | $86,587 | $204,812 |
$1,763
21,667
kWh
|
$302
-
kW-mo/yr
|
$84,522
-
MMBtu
|
||
TOTAL IMPLEMENTED | $86,587 | $204,812 |
$1,763
21,667
kWh
|
$302
-
kW-mo/yr
|
$84,522
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs