Assessment Year | 2023 |
---|---|
Principal Product | Ready-Mix Concrete Manufacturing |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
64,965
ft2
|
Annual Production | 250,000
lb
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $368,268 | 7,753,000 |
kWh
|
$0.048 |
Electricity Demand | $556,066 | 44,308 |
kW-mo/yr
|
$12.55 |
Electricity Fees | $123,153 | - |
|
- |
Natural Gas | $38,719 | 6,384 |
MMBtu
|
$6.07 |
TOTAL YEARLY COSTS | $1,086,206 | |||
RECOMMENDED SAVINGS* | $6,116 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,116 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $704 | $4,074 |
$279
5,882
kWh
|
$425
-
kW-mo/yr
|
- | - | |
02 | 2.3311: Replace dc equipment with ac equipment | $3,266 | $4,565 |
$214
4,499
kWh
|
$217
-
kW-mo/yr
|
- | $2,835 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,115 | $5,102 |
$553
11,638
kWh
|
$562
-
kW-mo/yr
|
- | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $1,031 | - | - | - |
$1,031
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $6,116 | $13,741 |
$1,046
22,019
kWh
|
$1,204
-
kW-mo/yr
|
$1,031
-
MMBtu
|
$2,835 | ||
TOTAL IMPLEMENTED | $6,116 | $13,741 |
$1,046
22,019
kWh
|
$1,204
-
kW-mo/yr
|
$1,031
-
MMBtu
|
$2,835 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs