ITAC Assessment: UW2305
ITAC logo
ITAC Assessment: UW2305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Ready-Mix Concrete Manufacturing
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 64,965
ft2
Annual Production 250,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,268 7,753,000
kWh
Electricity Demand $556,066 44,308
kW-mo/yr
Electricity Fees $123,153 -
Natural Gas $38,719 6,384
MMBtu
TOTAL YEARLY COSTS $1,086,206
RECOMMENDED SAVINGS* $6,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $704 $4,074 $279
5,882
kWh
$425
-
kW-mo/yr
- -
02 2.3311: Replace dc equipment with ac equipment $3,266 $4,565 $214
4,499
kWh
$217
-
kW-mo/yr
- $2,835
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,115 $5,102 $553
11,638
kWh
$562
-
kW-mo/yr
- -
04 2.7224: Reduce space conditioning during non-working hours $1,031 - - - $1,031
-
MMBtu
-
TOTAL RECOMMENDED $6,116 $13,741 $1,046
22,019
kWh
$1,204
-
kW-mo/yr
$1,031
-
MMBtu
$2,835
TOTAL IMPLEMENTED $6,116 $13,741 $1,046
22,019
kWh
$1,204
-
kW-mo/yr
$1,031
-
MMBtu
$2,835