ITAC Assessment: CL2114
ITAC logo
ITAC Assessment: CL2114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Plastic Extrusions
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 125,000
ft2
Annual Production 6,900,000
units
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $547,632 16,682,941
kWh
Electricity Demand $382,179 33,664
kW-mo/yr
Electricity Fees $10,838 -
Natural Gas $10,340 1,337
MMBtu
Waste Disposal Costs
Water Usage $9,926 4,178
Tgal
Water Disposal $23,828 4,178
Tgal
TOTAL YEARLY COSTS $984,743
RECOMMENDED SAVINGS* $94,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,537 - $2,356
71,766
kWh
$1,181
-
kW-mo/yr
02 2.7135: Install occupancy sensors $1,148 $1,615 $1,148
34,794
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $12,331 - $8,268
250,555
kWh
$4,063
-
kW-mo/yr
04 2.7261: Install timers and/or thermostats $10,678 $4,250 $10,678
323,590
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $66,420 $37,500 $62,521
1,894,564
kWh
$3,899
-
kW-mo/yr
TOTAL RECOMMENDED $94,114 $43,365 $84,971
2,575,269
kWh
$9,143
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs