ITAC Assessment: TR0005
ITAC logo
ITAC Assessment: TR0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Blades, Nozzles, and Hangers
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $1
M
to 5
M
# of Employees 500
Plant Area 108,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 8,544
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $605,704 18,643,402
kWh
Electricity Demand $528,871 47,946
kW-mo/yr
Electricity Fees $33,914 -
Natural Gas $29,914 11,104
MMBtu
Waste Disposal Costs
Water Usage $2,268 1,354
Tgal
Water Disposal $33,059 1,176
Tgal
TOTAL YEARLY COSTS $1,233,730
RECOMMENDED SAVINGS* $307,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $306,047

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $4,452 $6,500 $4,452
140,229
kWh
- - -
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $1,056 $417 $1,056
33,139
kWh
- - -
03 3.4146: Change method of deionized water production $258,000 $292,000 - - - $258,000
04 3.4155: Meter waste water $11,708 $2,650 - - $11,708
-
Tgal
-
05 2.7111: Reduce illumination to minimum necessary levels $15,338 $56,000 - $15,338
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,836 $8,821 $1,836
57,816
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $223 $399 $223
7,008
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $287 $494 $287
9,054
kWh
- - -
09 2.2522: Isolate hot or cold equipment $292 $1,422 $292
9,209
kWh
- - -
10 2.2521: Isolate steam lines to avoid heating air conditioned areas $8,320 $966 $8,320
262,056
kWh
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $5,882 $25,954 $5,882
185,274
kWh
- - -
TOTAL RECOMMENDED $307,395 $395,623 $22,349
703,785
kWh
$15,338
-
kW-mo/yr
$11,708
-
Tgal
$258,000
TOTAL IMPLEMENTED $306,047 $393,784 $21,001
661,437
kWh
$15,338
-
kW-mo/yr
$11,708
-
Tgal
$258,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs