Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,182

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics packaging materials and unlaminated film and sheet manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0590 #01 Y:2019 Clean or color roof to reduce solar load $12,001 $8,840
OK1017 #05 Y:2019 Reschedule plant operations or reduce load to avoid peaks $6,164 -
OK1017 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,214 $3,590
OK1017 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $22,220 $22,288
OK1017 #02 Y:2019 Install / repair insulation on steam lines $10,627 $231
OK1017 #01 Y:2019 Analyze flue gas for proper air/fuel ratio $7,604 $17,500
TR0012 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $230 $296
TR0012 #03 Y:2019 Insulate glazing, walls, ceilings, and roofs $8,664 $6,310
TR0012 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $11,120 $5,616
TR0012 #01 Y:2019 Insulate bare equipment $5,267 $1,049
AM0776 #06 Y:2019 Reduce illumination to minimum necessary levels $440 $100
AM0776 #05 Y:2019 Utilize energy-efficient belts and other improved mechanisms $2,244 -
AM0776 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $6,155 $38
AM0776 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $11,400 $2,000
AM0776 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $20,200 $60,000
AM0776 #01 Y:2019 Insulate bare equipment $46,030 $25,900
LE0471 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $854 $3,225
LE0471 #05 Y:2019 Replace existing hvac unit with high efficiency model $6,634 $18,400
LE0471 #04 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $26,397 $30,000
LE0471 #03 Y:2019 Use cooling tower or economizer to replace chiller cooling $24,476 $20,000