| Assessment Year | 2019 |
|---|---|
| Principal Product | Biaxial Geogrids |
| NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
| SIC | 3081: Unsupported Plastics Film and Sheet |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
230,411
ft2
|
| Annual Production | 9,600,000
lb
|
| Production Hrs. Annual | 6,258
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $165,645 | 2,567,679 |
kWh
|
$0.065 | |
| Electricity Demand | $78,509 | 9,252 |
kW-mo/yr
|
$8.49 | |
| Electricity Fees | $1,155 | - |
|
- | |
| Natural Gas | $64,642 | 10,110 |
MMBtu
|
$6.39 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,626 | 53 |
Tgal
|
$49.73 | |
| TOTAL YEARLY COSTS | $312,577 | ||||
| RECOMMENDED SAVINGS* | $47,829 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,604 | $17,500 | - | - |
$7,604
-
MMBtu
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $10,627 | $231 | - | - |
$10,627
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,220 | $22,288 |
$17,768
273,350
kWh
|
$4,452
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,214 | $3,590 |
$1,214
18,674
kWh
|
- | - | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,164 | - | - |
$6,164
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $47,829 | $43,609 |
$18,982
292,024
kWh
|
$10,616
-
kW-mo/yr
|
$18,231
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs