ITAC Assessment: OK1017
ITAC logo
ITAC Assessment: OK1017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Biaxial Geogrids
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 230,411
ft2
Annual Production 9,600,000
lb
Production Hrs. Annual 6,258
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,645 2,567,679
kWh
Electricity Demand $78,509 9,252
kW-mo/yr
Electricity Fees $1,155 -
Natural Gas $64,642 10,110
MMBtu
Waste Disposal Costs
Water Usage $2,626 53
Tgal
TOTAL YEARLY COSTS $312,577
RECOMMENDED SAVINGS* $47,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $7,604 $17,500 - - $7,604
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $10,627 $231 - - $10,627
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $22,220 $22,288 $17,768
273,350
kWh
$4,452
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,214 $3,590 $1,214
18,674
kWh
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,164 - - $6,164
-
kW-mo/yr
-
TOTAL RECOMMENDED $47,829 $43,609 $18,982
292,024
kWh
$10,616
-
kW-mo/yr
$18,231
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs