| Assessment Year | 2026 |
|---|---|
| Principal Product | Access Equipments |
| NAICS | 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
| SIC | 3536: Overhead Traveling Cranes, Hoists, and Monorail Systems |
| Sales Range | $50 M to 100M |
| # of Employees | 91 |
| Plant Area |
84,855
ft2
|
| Annual Production | 2,500
units
|
| Production Hrs. Annual | 6,200
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $222,244 | 3,376,129 |
kWh
|
$0.066 |
| Electricity Demand | $68,059 | 7,536 |
kW-mo/yr
|
$9.03 |
| Electricity Fees | $15,484 | - |
|
- |
| Natural Gas | $204,561 | 27,738 |
MMBtu
|
$7.37 |
| TOTAL YEARLY COSTS | $510,348 | |||
| RECOMMENDED SAVINGS* | $148,258 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.5111: Filter and reuse hydraulic oil | $133,648 | $70,360 |
$(-1,369.0)
(-20,813)
kWh
|
$(-361.0)
-
kW-mo/yr
|
$72,528
-
MMBtu
|
$62,850 | |
| 02 | 2.4224: Upgrade controls on compressors | $6,234 | $4,997 |
$4,932
74,956
kWh
|
$1,302
-
kW-mo/yr
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $3,595 | $9,464 |
$2,725
41,412
kWh
|
$870
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,542 | $591 |
$2,009
30,526
kWh
|
$533
-
kW-mo/yr
|
- | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $1,030 | $165 |
$813
12,355
kWh
|
$217
-
kW-mo/yr
|
- | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $664 | $3,172 |
$447
6,788
kWh
|
$217
-
kW-mo/yr
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $545 | $356 |
$428
6,508
kWh
|
$117
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $148,258 | $89,105 |
$9,985
151,732
kWh
|
$2,895
-
kW-mo/yr
|
$72,528
-
MMBtu
|
$62,850 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs