ITAC Assessment: NC0040
ITAC logo
ITAC Assessment: NC0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Conveyors & Motorized Pulleys
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 245,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,817 3,345,252
kWh
LPG $12,989 2,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $659 $480 $659
11,723
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $1,912 $1,600 $1,912
34,291
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $723 $360 $723
12,896
kWh
-
04 2.2437: Recover waste heat from equipment $2,044 $3,000 - $2,044
-
MMBtu
05 2.2628: Utilize a less expensive cooling method $10,722 - $10,722
192,556
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $807 $1,190 $807
14,361
kWh
-
TOTAL RECOMMENDED $16,867 $6,630 $14,823
265,827
kWh
$2,044
-
MMBtu
TOTAL IMPLEMENTED $2,189 $2,030 $2,189
38,980
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs