ITAC Assessment: MI0407
ITAC logo
ITAC Assessment: MI0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Foam
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 219,200
ft2
Annual Production 190,000,000
units
Production Hrs. Annual 4,940
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,511 1,937,597
kWh
Electricity Demand $58,960 5,557
kW-mo/yr
Electricity Fees $26,662 -
TOTAL YEARLY COSTS $205,133
RECOMMENDED SAVINGS* $14,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,431

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,140 $7,899 $2,920
47,395
kWh
$1,220
-
kW-mo/yr
02 2.4323: Use optimum size and capacity equipment $2,700 $3,310 $1,904
30,901
kWh
$796
-
kW-mo/yr
03 2.7135: Install occupancy sensors $2,509 $850 $2,032
32,989
kWh
$477
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $2,291 $580 $1,612
26,162
kWh
$679
-
kW-mo/yr
05 2.4239: Eliminate or reduce compressed air usage $1,645 $520 $1,157
18,776
kWh
$488
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,544 $2,200 $1,088
17,655
kWh
$456
-
kW-mo/yr
TOTAL RECOMMENDED $14,829 $15,359 $10,713
173,878
kWh
$4,116
-
kW-mo/yr
TOTAL IMPLEMENTED $6,431 $8,479 $4,532
73,557
kWh
$1,899
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs