ITAC Assessment: LE0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastics
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 20
Plant Area 90,000
ft2
Annual Production 70,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,577,115 22,635,727
kWh
Electricity Demand $515,042 36,590
kW-mo/yr
Electricity Fees $54,869 -
Natural Gas $19,014 1,947
MMBtu
TOTAL YEARLY COSTS $2,166,040
RECOMMENDED SAVINGS* $66,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $666 $35 $168
2,400
kWh
- $498
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,203 $2,000 $5,359
76,552
kWh
$1,844
-
kW-mo/yr
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $24,476 $20,000 $20,041
286,303
kWh
$4,435
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,397 $30,000 $20,681
295,440
kWh
$5,716
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $6,634 $18,400 $5,198
74,256
kWh
$1,436
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $854 $3,225 $530
7,568
kWh
$324
-
kW-mo/yr
-
TOTAL RECOMMENDED $66,230 $73,660 $51,977
742,519
kWh
$13,755
-
kW-mo/yr
$498
-
MMBtu
TOTAL IMPLEMENTED $58,361 $71,625 $46,450
663,567
kWh
$11,911
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs