ITAC Assessment: SD0590
ITAC logo
ITAC Assessment: SD0590
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastic Containers
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 25,000
ft2
Annual Production 9,500,000
units
Production Hrs. Annual 7,776
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $541,683 5,128,830
kWh
Electricity Demand $221,099 11,450
kW-mo/yr
Electricity Fees $33,356 -
TOTAL YEARLY COSTS $796,138
RECOMMENDED SAVINGS* $15,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $12,001 $8,840 $8,288
78,479
kWh
$3,713
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,948 - $1,948
18,450
kWh
-
03 2.4133: Use most efficient type of electric motors $880 $120 $683
6,468
kWh
$197
-
kW-mo/yr
04 2.7135: Install occupancy sensors $319 $585 $319
3,023
kWh
-
TOTAL RECOMMENDED $15,148 $9,545 $11,238
106,420
kWh
$3,910
-
kW-mo/yr
TOTAL IMPLEMENTED $3,147 $705 $2,950
27,941
kWh
$197
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs