ITAC Assessment: TR0012
ITAC logo
ITAC Assessment: TR0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product plastic bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 295,401
ft2
Annual Production 360,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,094 4,704,096
kWh
Electricity Demand $130,894 12,756
kW-mo/yr
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $367,989
RECOMMENDED SAVINGS* $25,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2511: Insulate bare equipment $5,267 $1,049 $4,111
82,219
kWh
$1,156
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,120 $5,616 $8,615
170,932
kWh
$2,505
-
kW-mo/yr
03 2.7491: Insulate glazing, walls, ceilings, and roofs $8,664 $6,310 $6,775
133,425
kWh
$1,889
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $230 $296 $180
3,574
kWh
$50
-
kW-mo/yr
TOTAL RECOMMENDED $25,281 $13,271 $19,681
390,150
kWh
$5,600
-
kW-mo/yr
TOTAL IMPLEMENTED $25,281 $13,271 $19,681
390,150
kWh
$5,600
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs