ITAC Assessment: UM0296
ITAC logo
ITAC Assessment: UM0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Precision Springs and Stampings
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range n/a
# of Employees 79
Plant Area 40,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,752 910,800
kWh
Electricity Demand $15,981 2,388
kW-mo/yr
Electricity Fees $3,320 -
Natural Gas $19,820 2,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,149 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $4,716 $50 $4,716
56,678
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,647 $3,688 $2,157
25,921
kWh
$490
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,389 $75 $2,054
24,693
kWh
$335
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $1,352 $400 $(-46.0)
(-442)
kWh
$6
-
kW-mo/yr
$1,392
-
MMBtu
05 2.2426: Use waste heat from flue gases to heat space conditioning air $1,144 $392 $(-42.0)
500
kWh
$(-10.0)
-
kW-mo/yr
$1,196
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $646 $200 $556
6,691
kWh
$90
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $255 $92 $255
3,063
kWh
- -
TOTAL RECOMMENDED $13,149 $4,897 $9,650
117,104
kWh
$911
-
kW-mo/yr
$2,588
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs