ITAC Assessment: TT0149
ITAC logo
ITAC Assessment: TT0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Marine Power Systems
NAICS 333618: Other Engine Equipment Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 117
Plant Area 213,260
ft2
Annual Production 6,500
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,629 4,262,400
kWh
Electricity Demand $206,516 16,696
kW-mo/yr
Natural Gas $133,010 24,838
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,151

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1133: Adjust burners for efficient operation $12,531 $1,500 - - $12,531
-
MMBtu
02 2.2511: Insulate bare equipment $11,633 $6,247 $11,633
178,969
kWh
- -
03 2.2511: Insulate bare equipment $3,904 $740 $3,904
60,067
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,662 $8,000 $2,376
36,554
kWh
$1,286
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $8,830 $1,514 $8,830
135,846
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,084 $3,000 $2,649
40,758
kWh
$1,435
-
kW-mo/yr
-
07 2.6218: Turn off equipment when not in use $10,606 $2,440 $10,606
163,170
kWh
- -
08 2.6218: Turn off equipment when not in use $755 $440 $755
11,613
kWh
- -
09 2.7122: Disconnect ballasts $275 $90 $218
3,351
kWh
$57
-
kW-mo/yr
-
10 2.7135: Install occupancy sensors $384 $804 $384
5,906
kWh
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $247 $1,200 $160
2,457
kWh
$87
-
kW-mo/yr
-
TOTAL RECOMMENDED $56,911 $25,975 $41,515
638,691
kWh
$2,865
-
kW-mo/yr
$12,531
-
MMBtu
TOTAL IMPLEMENTED $24,151 $8,958 $22,629
348,137
kWh
$1,522
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs