ITAC Assessment: OK0836
ITAC logo
ITAC Assessment: OK0836
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Hardwood Flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 135,000
ft2
Annual Production 1,500
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,047,458 21,619,560
kWh
Electricity Demand $383,093 47,129
kW-mo/yr
Natural Gas $22,567 2,902
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $320,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,500 $1,700 $1,220
25,100
kWh
$280
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,200 $27,500 $8,500
175,500
kWh
$2,700
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,400 $10,000 $1,800
36,900
kWh
$600
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $28,900 $15,100 $15,900
332,000
kWh
$13,000
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $9,000 $500 - - - $9,000
-
MMBtu
06 2.1321: Replace fossil fuel equipment with electrical equipment $7,200 $1,000 $(-9,800.0)
(-202,000)
kWh
$(-5,300.0)
-
kW-mo/yr
$22,300
-
MMBtu
-
07 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $248,000 $675,000 $248,000
4,400,000
kWh
- - -
08 2.4131: Size electric motors for peak operating efficiency $12,700 $13,000 $12,700
187,500
kWh
- - -
TOTAL RECOMMENDED $320,900 $743,800 $278,320
4,955,000
kWh
$11,280
-
kW-mo/yr
$22,300
-
MMBtu
$9,000
-
MMBtu
TOTAL IMPLEMENTED $47,500 $26,600 $7,900
166,900
kWh
$8,300
-
kW-mo/yr
$22,300
-
MMBtu
$9,000
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs