Assessment Year | 2012 |
---|---|
Principal Product | Hardwood Flooring |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
135,000
ft2
|
Annual Production | 1,500
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,047,458 | 21,619,560 |
kWh
|
$0.048 |
Electricity Demand | $383,093 | 47,129 |
kW-mo/yr
|
$8.13 |
Natural Gas | $22,567 | 2,902 |
MMBtu
|
$7.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $320,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,500 | $1,700 |
$1,220
25,100
kWh
|
$280
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,200 | $27,500 |
$8,500
175,500
kWh
|
$2,700
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,400 | $10,000 |
$1,800
36,900
kWh
|
$600
-
kW-mo/yr
|
- | - | |
04 | 2.4224: Upgrade controls on compressors | $28,900 | $15,100 |
$15,900
332,000
kWh
|
$13,000
-
kW-mo/yr
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,000 | $500 | - | - | - |
$9,000
-
MMBtu
|
|
06 | 2.1321: Replace fossil fuel equipment with electrical equipment | $7,200 | $1,000 |
$(-9,800.0)
(-202,000)
kWh
|
$(-5,300.0)
-
kW-mo/yr
|
$22,300
-
MMBtu
|
- | |
07 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $248,000 | $675,000 |
$248,000
4,400,000
kWh
|
- | - | - | |
08 | 2.4131: Size electric motors for peak operating efficiency | $12,700 | $13,000 |
$12,700
187,500
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $320,900 | $743,800 |
$278,320
4,955,000
kWh
|
$11,280
-
kW-mo/yr
|
$22,300
-
MMBtu
|
$9,000
-
MMBtu
|
||
TOTAL IMPLEMENTED | $47,500 | $26,600 |
$7,900
166,900
kWh
|
$8,300
-
kW-mo/yr
|
$22,300
-
MMBtu
|
$9,000
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs